How long does it take to do a full bathroom renovation?

Assuming you don't work on the weekends,. At my first appointment with clients, I always give a clear indication of how long a project should last.

How long does it take to do a full bathroom renovation?

Assuming you don't work on the weekends,. At my first appointment with clients, I always give a clear indication of how long a project should last. And when I say “your bath from start to finish will last approximately six weeks”, I am totally surprised. If you're a designer or builder, I know you're nodding your head in agreement.

Reality shows have completely discarded any realistic expectations about how long renewals will take. Before any renovation is carried out in your bathroom, it is necessary to carry out some preliminary work. You should have a good idea of what you want from your remodel before meeting with your contractor. You'll need to review your plans with a contractor, who will need time to measure the space, know what features you want to include, and work with you to decide where they should best be placed.

These details will also help your contractor establish an estimate of the cost of the remodel. That said, it's usually fairly easy to make a rough estimate of how long a complete remodel of a small bathroom will take if you're working with a competent general contractor who works with equally competent subcontractors. While bathroom remodeling on television shows seems to be progressing faster, it could be a little slower off-screen, as it focuses largely on actual renovation work, ignoring the time needed for other non-tangible measures. This indicates how inefficient the process has become, says Luke Sherwin, co-founder of Block Renovation, a New York City design and construction startup whose pricing algorithm demystifies and simplifies bathroom renovations, halving the average time it takes to renovate a bathroom.

Unless you're lucky enough to have multiple bathrooms, leaving the only bathroom disabled during the remodel is a major inconvenience. The average master bathroom renovation takes four months from planning to the first time you enjoy your new shower, and smaller bathrooms take a couple of weeks less time, according to a national survey of renovators by Houzz %26 Home. Once the existing bathroom has been demolished, the layout, the frame and the backrest are carried out, transforming the contours of the design into the actual space of the bathroom. Remodeling a small bathroom without demolition or electrical or plumbing redirection could take as little as five business days.

Usually, a remodel that completely destroys the bathroom and moves electrical and plumbing lines to install new fixtures in new locations will take four to eight weeks (and that's with a professional doing the job). But if remodeling the bathroom requires removing the wall studs, removing the bathtub or shower and the surrounding tiles, etc., this is a real demolition.